    Client Project Title Type
    TERNA S.A. Plovdiv-Svilengrad railway, Section Krumovo-Parvomai Supporting Services on Works' Programming  
    Ministry of Public Works Urban Planning and the Environement
    Management Authority for Community Initiative URBAN II Programmes
    1. Consulting Services for the Auditing of Operational Programmes in the city of Perama, GR Project Management
    2. Consulting Services for the Auditing of Operational Programmes in the city o Komotini, GR
    3. Consulting Services for the Auditing of Operational Programmes in the city o Iraklio, GR
    AKP Architects Definition of flood lines at the Triantaros Torrent in Tinos island Final Design
    Μunicipality of Vrilissia Redesign of the stormwater collector E13-2 in the area of Patima, Vrilissia by making use of BMPs Feasibility study
    Region of East Macedonia & Thrace
    (INTEREG III C - ZONE SUD)
    External Expert Services for the support of the project:
    "La gestion stratégique de la défense des littoraux pour un développement soutenable des zones côtières de la Méditerranée / BEACHMED-e"
    INTERREG III C – ZONE SUD
    Project Management
    ERGOSE S.A. Design of the Suburban Rail section Stavros-Rafina -Phase A'
    (Hydraulic Works Design)
    Preliminary design
    In partnership with Planitiki S.A. and OMT
    Μunicipality of Vrilissia Design of a new stormwater collector under Pentelis Avenue in Vrilissia Final design
    Μunicipality of Vrilissia Design of slope retention measures in the Penteli-Chalandri Torrent Final design
    Vinci Grands Projets Hellas S.A. Flood Protection Design for the Athens Metro Extension towards Elliniko Final Design
    Μunicipality of Acharnai Design of a stormwater retention facility for the S1 and S3 central collectors in Acharnai Final design
    Μunicipality of Acharnai Design of a stormwater retention facility for the S2 central collector in Acharnai Final design
    GMP INTERNATIONAL TRADE POWER Definition of Flood Lines for the Assopos river within the limits of the GMP industrial site Hydraulic design
     